The project consists in the renovation of a 16th Century listed building in Carinthia, Austria. The property was in the state of a ruin, as the construction was interrupted abruptly with the Thirty Year’s war (1618-1648) and the building was never completed. The renovation project thus entailed not only restoring the building for residential use, but de facto completing it and at the same time retroactively connecting it to all infrastructural systems, such as acqueduct, sewers, elecritity, etc. The design intent was that of allowing the caratcter of unfinished building to remain legible and respect the structural integrity of the historic fabric.